Skip to content
Description of Project
- Engineering and consultancy services for the first and second stages of establishing fire alarm and extinguishing systems in Mobarakeh Steel Company and Saba Steel, 2021
- Design and engineering review operations, procurement of all construction equipment and materials for domestic and international projects, packaging, transportation, construction, installation, testing, and commissioning operations, training and guaranteeing the performance of the mechanized truck, and provision of spare parts for two years of operation (EPC) in Mobarakeh Steel Company, 2022
- Specialized engineering and consultancy services for the first and second stages of constructing metal frames and structures, mechanical facilities, water and sewage facilities, and fire extinguishing systems, environmental and manufacturing studies, and design of mechanisms in Mobarakeh Steel Company, 2020
- Design and engineering, packaging, transportation, installation, testing and commissioning, training, and guaranteeing the performance of the new electrical room, Saba Steel, 2020
- Design and engineering, construction, installation, preparation of metal and electrical framework, testing and commissioning, training, and guaranteeing the performance of the expanded EFS-B 63/6/6 KV substation in the steelmaking unit, 2013
Scroll To Top